The then Ministry of Electricity sent a group of engineers and workers to the South to design and construct Tri An Hydropower Plant - the first power project in the South after reunification.
Power Investigation and Design Company 2 (PIDC2) was established, under the then Ministry of Electricity.
Renamed to Power Engineering Consulting Company 2 (nổ hũ ) in accordance with Decision No. 02/1999/QD-BCN of the then Minister of Industry.
Became Power Engineering Consulting Joint Stock Company 2 (nổ hũ ), in which the Vietnam Electricity (EVN) controlled 51.26% stake.
Officially listed shares (TV2 symbol) on the Hanoi Stock Exchange.
Opened the Representative Office in Myanmar.
Officially listed shares (TV2 symbol) on HOSE.
nổ hũ Innovation Hub Inauguration.