Image of concrete pumping for the chimney foundation of Vinh Tan 4 Extension TPP Project
The chimney item is a component package in the EPC project for the construction of Vinh Tan 4 Extension TPP, which was undertaken by EVNnổ hũ , a member of the consortium of contractors. With the height of 213.5m and a diameter of 6.35 m, the chimney is an important item of the plant. Exhaust emissions contained such dangerous gas and dust are filtered through the systems of Flue Gas Desulphurization (FGD), Selective Catalytic Reduction (SCR) and Electrostatic Precipitator (ESP) and only small amount of dust, about 0.03% getting out of the chimney. Besides that, at the high altitude of over 200m, dust from the chimney will be diffused without compromising on air quality and fully meets the requirements of national technical standards for industrial exhaust gas of thermal power plants. The completion of concreting the chimney foundation on schedule is an important step to ensure the progress of the overall project as well as soon put the plant in to operation by the end of 2019.
Here are the following pictures of pumping the chimney concrete foundation:
Geological drilling in the chimney area
The preparation work before pouring concrete started at the end of June 2017
Consultants, EVNnổ hũ and CRI are inspecting the reinforcement, formwork before pouring concrete
The concrete foundation pumping was completed successfully at midday of 16 July