Dong Nai 5 Hydropower Plant

  • Location:
    On Dong Nai River
  • Designed Capacity:
    150MW
  • Commencement:
    24/12/2012
  • Status:
    Unit 1 officially ran to generate electricity and connected to the national grid on September 30, 2015, unit 2 connected to the national grid on November 13, 2015.
  • Investor:
    Vietnam Coal and Mineral Industries Group
  • Scope of Work:
    Surveying, technical design and bidding documents for the project.