Cổng nổ hũ phổ biến nhất - Top 10 bảng xếp hạng nổ hũ

SrePok 3 Hydropower Plant

  • Location:
    30km from Ban Me Thuot City to the northeast along provincial road 681, 400km from Ho Chi Minh City to the northeast.
  • Designed Capacity:
    220 MW
  • Commencement:
    24/12/2005
  • Status:
    Water storage on 11/05/2009, 1 commercial power generation on 30/06/2010 and 2nd commercial on 30/09/2010.
  • Scope of Work:
    Survey design
Chia sẻ: